Good news we have a date to move into the new house. Next Friday the 27th Yeah!!!
Floor boards are now in and polished and just the carpet and a bit of touch up painting to go.
Mirboo fencing now up at the sides of the house. The Children now will not escape.
Showing posts with label house building. Show all posts
Showing posts with label house building. Show all posts
Saturday, August 21, 2010
Sunday, June 6, 2010
House Building ::16
Got to the house today and snapped a few pictures. Builder thinks it will be 4-5 weeks till we are in. Mmmm I think 7-8 weeks.
Stairs now added!
Most of the kitchen is now in, just need bench top, basin, stove, dishwasher.
The view from the rear veranda. You can see the wetlands.
The main living area, you can just see a bit of a hint of the kitchen on the right.
Sunday, May 16, 2010
house building ::15
A few things happened this week. The house got a paint. 'Sea Mist' Bit hard to pick up on the crappy iphone camera.
Shower basin!
Insulation
Next week should see the kitchen going in as well as finishing the plaster.
Labels:
crappy iphone camera,
house building,
insulation,
shower basin
Wednesday, May 5, 2010
House Building ::14
Thursday, April 8, 2010
House Building ::13
Lots of action....
Cladding starting to go up today.
The Garage roof is now on.
Prior to the cladding they put this green shinny insulation stuff up. Not really sure what it does.
The rear deck now has the sliding doors in place.
Cladding starting to go up today.
The Garage roof is now on.
Prior to the cladding they put this green shinny insulation stuff up. Not really sure what it does.
The rear deck now has the sliding doors in place.
Friday, April 2, 2010
House Building ::12
Lots has happened this week....
The Majority of the frame is up. All that needs to be done is the roof for the garage.The garage also got a slab of concrete (no picture sorry).
The bottom of the house got a skirting board from the ground to the floor.
About half the windows are now in.
Lastly a look from the rear. The decking flooring still looking like it needs to be done.
The Majority of the frame is up. All that needs to be done is the roof for the garage.The garage also got a slab of concrete (no picture sorry).
The bottom of the house got a skirting board from the ground to the floor.
About half the windows are now in.
Lastly a look from the rear. The decking flooring still looking like it needs to be done.
Labels:
beach house constructions,
frame,
house building,
windows
Thursday, March 25, 2010
House Building ::11
Hard to see what has been happening but there is a bit of work around the place.
The rear deck beams have now been cemented in.
There is a small landing under the rear deck. That is now up.
Lastly the flooring for the second floor has now been put into place. Its a bit hard to see in the photo, but it is there.
The rear deck beams have now been cemented in.
There is a small landing under the rear deck. That is now up.
Lastly the flooring for the second floor has now been put into place. Its a bit hard to see in the photo, but it is there.
Tuesday, March 23, 2010
Monday, March 22, 2010
House Building ::9
A fair bit of work today. The joists for the second floor were put in place.
The front deck was also put in place, for the upstairs front bedroom.
The front deck was also put in place, for the upstairs front bedroom.
Saturday, March 20, 2010
House Building::8
The bottom story is now completed of the frame which is exciting.
At the back of the house you can see there is a fair bit of material, which looks like it is for the joists and floor for up stairs.
Lastly also a bit of work done under the house with plubming from bathroom, and toilets
Thursday, March 18, 2010
House Building ::7
Its nice to see thing going vertical. The frame is going up! So far about 1/3 of the ground floor. The bathroom, toilet, laundry and rumpus room.
Thursday, March 11, 2010
House Building ::6
After a bit of a delay 10 or so days. Things are moving again. Looks like the bearers/joists ? were put in place over the stumps today.
A bit more material on hand. left to right. More timber for the joists/ bearers. floor boards, timber columns for the deck.
A bit more material on hand. left to right. More timber for the joists/ bearers. floor boards, timber columns for the deck.
Monday, March 1, 2010
House Building ::5
Some happening between Thursday and today.
It looks like a bit of scaffold. I'd say this is for the second story component of the house.
A tap!
It looks like a bit of scaffold. I'd say this is for the second story component of the house.
A tap!
Wednesday, February 24, 2010
House Building ::4
Busy day today. Just about all of the stumps were put in place, except those supporting the deck. Interesting a combination of cement and timber.
Monday, February 22, 2010
House Building ::3
Bit of action on the block today. It appears the downpipes as well as the holes for the stumps have been dug.
pretty deep holes, 2m or more
Some pipe which looks like it heads to sewage
You can see a few stumps which I presume will get up it the holes soon
Subscribe to:
Posts (Atom)


































